|
Photo Courtesy of Dreamworks |
On February 5, 2011, the Environmental Quality Board amended Chapter 78 (oil and gas wells) of Title 25 of the Pennsylvania Code. The revisions to Chapter 78 include amendments that require operators to have a pressure barriers plan to minimize well control events and keep a list of emergency contact phone numbers at the well site. Operators are now also required to condition the wellbore to ensure an adequate bond between the cement, casing and the formation and to use centralizers to ensure that casings are properly positioned in the wellbore. Lastly, a provision was added that requires improved quality of cement placed in the casing that protects fresh groundwater. To view the new regulations in full, please see
The Pennsylvania Bulletin.
Written by Steven P. Trialonas, Research Fellow
February 5, 2011
Hello we Can supply Aviation Kerosene, Jet fuel (JP 54-A1,5), Diesel (Gas Oil) and Fuel Oil D2, D6,ETC in FOB/Rotterdam only, serious buyer should contact or if you have serious buyers
ReplyDeletemy seller is ready to close this deal fast contact us below: now base email us severgazinvest@inbox.ru
PRODUCT AVAILABLE IN ROTTERDAM/ CI DIP AND PAY IN SELLER EX-SHORE TANK.
Russia D2 50,000-150,000 Metric Tons FOB Rotterdam Port.
JP54 5000,000 Barrels per Month FOB Rotterdam.
JA1 Jet Fuel 10,000,000 Barrels FOB Rotterdam.
D6 Virgin Fuel Oil 800,000,000 Gallon FOB Rotterdam.
E-mail: paveleriks@mail.ru
Phone via WhatsApp/
Call +79167856894
Best Regards